![]() |
Owner | Egyptian Electricity Holding Co., Egypt. |
![]() |
Client | Abb Sae Sadelmi, Italy. |
![]() |
Engineer | Dr. M. Ali El Saae, Egypt. |
Description
Civil works construction of the thermal power plant in Assiut.
The capacity of the plant is 300MW.
The scope of works includes civil works, finishing works and electromechanical works for the power plant including the water pumping unit.
The contract is on re-measure basis.